(a) Vendors of large recycle receptacles shall be responsible for obtaining a permit for each large recycle receptacle from the City Engineering Division of the Department of Public Works prior to the installation in any public right-of-way. Each large recycle receptacle shall have the capacity of 300 to 450 gallons and shall be in accordance with standard specifications designated by the Department of Public Works.
(b) All large recycle receptacles must be approved in accordance with Subsection (a) of this section.
Codified by Ord. No. 2021-15 (JCC. 2/2/21, Pass. 3/2/21, App. 3/3/21, Pub. 4/15/21, Eff. 4/15/21).
Large recycle receptacles shall be legibly and permanently labeled with the following information:
(1) The name of the manufacturer and vendor;
(2) The capacity of the bin in cubic yards; and
(3) The address of the establishment for which the recycle receptacle was approved in Arabic numerals at least three inches in height.
Codified by Ord. No. 2021-15 (JCC. 2/2/21, Pass. 3/2/21, App. 3/3/21, Pub. 4/15/21, Eff. 4/15/21).
(a) Where large recycle receptacles are authorized, they shall not be placed or installed upon a public right-of-way until a permit has been obtained from the City Engineering Division of the Department of Public Works.
(b) A permit shall be issued only after payment of a fee as determined by the City Engineering Division of the Department of Public Works. Permits will not be issued and large recycle receptacles shall not be provided for joint use of two or more domestic or commercial establishments.
(c) The large recycle receptacles must be properly installed to comply with all required specifications. A concrete slab as approved by the Department of Public Works may be required. Where deemed necessary, any permit may be revoked for cause by the Director of the Department of Public Works.
Codified by Ord. No. 2021-15 (JCC. 2/2/21, Pass. 3/2/21, App. 3/3/21, Pub. 4/15/21, Eff. 4/15/21).
Any large recycle receptacles relocated to another residential structure or commercial establishment shall be subject to all requirements for a new installation including an application for a permit to install at the new location.
Codified by Ord. No. 2021-15 (JCC. 2/2/21, Pass. 3/2/21, App. 3/3/21, Pub. 4/15/21, Eff. 4/15/21).
Codified by Ord. No. 2021-15 (JCC. 2/2/21, Pass. 3/2/21, App. 3/3/21, Pub. 4/15/21, Eff. 4/15/21).